Helicopter Crash Training Pool, Jandakot
Requirements:
Construction of 25m x 11m x 4m deep pool that will be constructed using 16 tonnes of steel and 250 cubes of concrete. The plumbing will include over 100 metres of pipe and the pool will use floor returns and specially made fibreglass suction tanks made at our factory. The pool will be heated through a combination of Natural Gas and 150% solar coverage. This pool is due for completion in April 2012.
Construction of 25m x 11m x 4m deep pool that will be constructed using 16 tonnes of steel and 250 cubes of concrete. The plumbing will include over 100 metres of pipe and the pool will use floor returns and specially made fibreglass suction tanks made at our factory. The pool will be heated through a combination of Natural Gas and 150% solar coverage. This pool is due for completion in April 2012.


/>